The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Transportation
Still Creek Pedestrian Bridge Replacement

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Bobtail Forest Service Road Overpass

Transportation
Fourth Street Pedestrian Overpass

Transportation
Moody Street Overpass

Transportation
Seymour Canyon Suspension Bridge

Active Transportation
Highway 1 at Mountain Highway Interchange

Transit
SkyTrain Crossing of South Point Drive

Transportation
St. Johns Street Redesign – Active Transportation and Pedestrian Accessibility Improvements

Transportation
Highway 7 Haney Bypass Intersection Improvements

Transportation
Outlook Truss Bridge Assessment

Bridges
Muskeg River Bridge

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transportation
Battleford Truss Bridge Rehabilitation

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
LEADERSHIP INSIGHTS
See all insights










