Location
Edmonton, Alberta
Expertise
Transportation
Bridges
Bridge Rehabilitation & Retrofit
Share
The City of Edmonton retained Associated Engineering to complete the bridge condition assessment and preliminary rehabilitation strategy reports for three overpasses at the intersection of 170 Street: B185 over Yellowhead Trail & B170/B171 (NB/SB) over the CN Rail Bissell Yard.
The condition assessments included review of the bridge’s history, detailed visual inspection and materials testing, and load evaluation. The preliminary rehabilitation strategies included the review of controlling factors such as structural condition, roadway alignment and drainage, environmental issues, traffic staging, public engagement with local businesses including CN Rail, and utility coordination.

Client
City of Edmonton

Project Highlights
The rehabilitation works for B170 and B171 were split into two stages. The B171 rehabilitation was completed in the first stage, which began in April 2017 and was completed October 2017. Rehabilitation of B170 was completed during the second stage and began in October 2019 and was completed June 2021.
People on this project
More Transportation Projects
See all projects

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Streetscaping
Nigel Valley Public Spaces

Transportation
Calgary Airport Runway and Tunnel

Transportation
Coast Meridian Overpass Detailed Inspection

Transportation
Haisla Bridge Replacement

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transportation
Casino Mine Access Road

Transportation
Medicine Hat Transit ITS Decision Support

Transportation
Highway 16 SAFE Corridor

Transportation
Highway 7 Haney Bypass Intersection Improvements

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
LEADERSHIP INSIGHTS
See all insights