The Slave Lake region was severely affected by wildfires in May 2011 that destroyed a significant portion of the town.
The infrastructure was further deteriorated due to the intensive residential and commercial reconstruction efforts. Associated Engineering was retained to provide consulting services, design, procurement and construction services for the four-year infrastructure recovery efforts, including rehabilitation of:
- 3,100 m of watermain
- 930 m of sanitary sewer
- 810 m of storm sewer
- 120 misc. utility spot repairs
- 8,600 m of walkway
- 3,900 m of curb
- 93,000 m2 of roadway.
Project Highlights
The project had a fixed budget and cost control measures were essential. The project required an effective procurement and phasing strategy to consider homeowner access, transportation routes disruption, and ongoing utility services. The project team selected a construction management approach, somewhat unique for urban rehabilitation, to enable more flexibility and collaboration and successfully deliver this project.
More Infrastructure Projects
See all projects
Infrastructure
Thirsk Dam and Spillway Rehabilitation
Infrastructure
Buffalo Creek Culvert Replacement
Transportation
Granville Bridge Seismic Retrofit and Renewal
Energy
Site C Clean Energy
Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study
Infrastructure
Minnedosa Community Housing
Infrastructure
West Calgary Storm Sewer Relief
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Infrastructure
Calgary Northwest Inner City Drainage Study
Infrastructure
Tsawwassen Mills Mall
Transit
SkyTrain Fraser River Crossing North Approach Spans
Water
Jericho Reservoir
Infrastructure