Location
Norman Wells, NWT
Expertise
Infrastructure
Ice Engineering
Share
The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Infrastructure
Rosehill Reservoir Rehabilitation
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Transportation
Don River Blvd. Bridge Rehabilitation
Infrastructure
Irrigation System Strategy
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Transportation
Haisla Bridge Replacement
Infrastructure
Melville Water Treatment Plant
Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction
Infrastructure
Drainage Improvement Study
Environmental
Splatsin Eagle River Compensation Site Identification Site
Infrastructure
Gitwinksihlkw Water Treatment Plant
Infrastructure
Lakeshore Drive Redevelopment
Infrastructure
Calgary Northwest Inner City Drainage Study
Bridges
Moody Street Overpass
LEADERSHIP INSIGHTS
See all insights