The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Transportation
184 Street and Yellowhead Trail Interchange
Infrastructure
Irrigation System Strategy
Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Environmental
Port of Vancouver – Climate Change Adaptation
Infrastructure
Livestock and Forage Centre of Excellence
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Transportation
Granville Bridge Seismic Retrofit and Renewal
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
Bridges
Ironworkers Memorial Second Narrows Bridge Fatigue Study
Land Development
Blackwolf Community Development
Land Development