Location
Pelham, Ontario
Expertise
Infrastructure
Buildings
Building Mechanical
Share
The Region of Niagara’s Pelham Patrol Yard provides fueling for their fleet of winter road maintenance vehicles.
With an aging fueling facility and leaks identified in similar installations the Region of Niagara retained Associated Engineering to provide, Detailed Design, Contract Administration and Construction Supervision services for the removal and replacement of the existing fueling facility that included two underground fuel storage tanks, pumps and associated piping and electrical.
Project Highlights
The replacement facility design included two above ground fuel tanks, one diesel and one unleaded gasoline, fuel pumps, area lighting, operator kiosk and all associated underground piping and wiring including connections for backup generator power supply and provisions for future fuel management system (card reader/keypad).
Given the close proximity of the facility to a natural drainage course, we also liaised with the Ministry of Natural Resources to ensure the design, remediation and construction were completed in accordance with all applicable provincial and federal regulations including Environmental Management Protocols issued by the Technical Standards and Safety Authority and Ontario Regulation 153/04.
More Infrastructure Projects
See all projects
Infrastructure
Thirsk Dam and Spillway Rehabilitation
Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Environmental
37 Street SW Storm Trunk Relocation
Parks & Recreation
North Langford Turf Field
Transportation
184 Street and Yellowhead Trail Interchange
Environmental Assessment
Fischer-Hallman Road Environmental Assessment
Infrastructure
Tsawwassen Mills Mall
Infrastructure
Big Dock and Water Front Area Redevelopment
Airports
Christina Lake Infrastructure Upgrading
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
Roads and Drainage Construction, Lake Babine Nation
Infrastructure
Lakeshore Drive Redevelopment
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Infrastructure