Location
Kelowna, British Columbia
Expertise
Pump Stations
Wastewater Collection & Storage
Share
In 2011 the District of West Kelowna (City of West Kelowna) engaged Associated Engineering to provide assessment report of the existing Faulkner Lift Station.
Upon assessment report, it was concluded that the existing lift station would require major upgrades to ensure municipality has infrastructure to meet their needs and future design considerations.
The required works included new building for electrical controls and power supply, and installation of new wetwell. The existing electrical and lift station was to remain operational throughout construction until completion of new infrastructure.
Associated Engineering provided preliminary and detailed design for this project, complete with full contract documents and specifications for mechanical, electrical, structural and civil disciplines. We provided contract administration and construction inspection services through completion of project.
Completion of the lift station was early 2015.

Client
The District of West Kelowna (City of West Kelowna)

Project Highlights
More Pump Stations Projects
See all projects

Environmental Engineering
Regina Hauled Waste Receiving Station

Water
Welland Water Treatment Plant

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse

Building Structures
Columbia Street Pump Station

Infrastructure
Raw Water Supply – Pipeline River Crossing

Building Mechanical
Arbutus Water Treatment Plant

Pump Stations
Horseshoe Slough Drainage Pump Station

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Pump Stations
Oakville Water Purification Plant

Infrastructure
Forest Lawn Lift Station

Energy
Process Energy Audits

Pump Stations
Homer Watson Pump Station Upgrade

Building Mechanical
Craigflower Pump Station

Pump Stations