The Northwest Territories Housing Corporation retained Associated Environmental to conduct Designated Substance Surveys (hazardous building materials surveys) at 57 housing units in Inuvik, Tuktoyaktuk, Aklavik, Paulatuk, Ulukhaktok, and Sachs Harbour.
The surveys were required as part of due diligence practices to identify environmental and human health risks associated with the following designated substances: asbestos-containing material (ACM), lead-based paint (LBP), polychlorinated biphenyls, mercury, urea formaldehyde foam insulation, ozone-depleting substances, glycol, and mould. Associated also assessed the above-ground storage tanks on site.


Project Highlights
The objective of each survey was to identify, through visual inspection or intrusive sample collection and laboratory analysis, the designated substances, their locations within each housing unit, and the estimated quantities that require removal as hazardous or special waste.
The Northwest Territories Housing Corporation used the results from the surveys to prepare work plans and tender specifications.
More Contaminated Sites Management Projects
See all projects

Transportation
Highway 7 Haney Bypass Intersection Improvements

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Environmental
Contamination Management, Valley Line LRT

Active Transportation
Okanagan Rail Corridor Ballast Testing and ESA Reviews

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Contaminated Sites Management
Environmental Assessment for New Wastewater Facility

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings
LEADERSHIP INSIGHTS
See all insights