Location
Bermuda, International
Expertise
Asset Management
Share
St. George’s Parish is situated on the eastern tip of the islands of Bermuda.
The existing water and wastewater services are piecemeal; providing limited areas with potable water, sanitary flushing water, sewage collection, and salt water fire hydrant mains. AE was retained to review the current water and sewage systems in the Parish of St George’s to establish a baseline from which appropriate policies could be determined to offer options for management of service delivery, identify infrastructure investments required to deliver sustainable water and wastewater servicing, and complete a financial analysis of current and proposed service delivery systems. AE completed a 25-Year Water and Wastewater Servicing strategy for St. George’s Parish in the islands of Bermuda.

Project Highlights
People on this project
More Asset Management Projects
See all projects

Strategic Advisory Services
City of Calgary Valuation of Natural Assets

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transportation
Canmore Bridge Management

Asset Management
Peterborough Streetlighting City-wide Assessment

Strategic Advisory Services
Peterborough Streetlight Condition Assessment

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Strategic Advisory Services
City of Calgary Asset Management Plans

Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services

Transportation
BC Earthquake Integrated Asset Management Plan

Asset Management
Melville Asset Management Plan

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Strategic Advisory Services
Lethbridge Energy Efficiency Master Plan and Strategy
LEADERSHIP INSIGHTS
See all insights