Location
Brampton, Ontario
Share
The Region of Peel determined as part of their Water and Wastewater Master Plan, that 5.6km of the existing trunk sanitary sewer between Queen Street and Highway 407 needed to be twinned to address existing and future capacity issues servicing the Town of Caledon and Brampton East developments.
The Region retained Associated Engineering to complete a Schedule “B” Environmental Assessment, detailed design and construction phase services for the twinning of the existing trunk sanitary sewer which consists of approximately 5.6 km of 1500, 1650 and 1800mm diameter trunk sanitary sewer. The alignment is located between the intersection of Queen Street and Goreway Drive to south of Highway 407 and Steeles Avenue and includes three creek crossings, a crossing of the 407ETR and a CN Rail Crossing.


Project Highlights
The design allows the existing main to remain in operation until the appropriate connections to the new system can be made. Included are three trunk sewer mains, four forcemains and six branch connections. The tendered design included 3000m of open cut installation and 2600m of trenchless installation for the new trunk sanitary sewer. The trenchless design includes microtunneling techniques.
The design incorporates early roll out of the Region’s new sanitary sewer design standards including requirements for pressure testing of the sewer line and implementation of other improved waterproofing techniques to reduce I&I.
People on this project
More Infrastructure Projects
See all projects

Transportation
Seymour Canyon Suspension Bridge

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Infrastructure
Minnedosa Community Housing

Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation

Environmental
37 Street SW Storm Trunk Relocation

Energy
District Energy – Blatchford Redevelopment

Parks & Recreation
Pexsisen Elementary School

Strategic Advisory Services
Peterborough Streetlight Condition Assessment

Infrastructure
Gold Bar Wastewater Treatment Plant

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Land Development
Lethbridge Crossings Development

Infrastructure
Highway 69 Twinning

Environmental
Big Bend Master Drainage Plan

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Infrastructure
Kennedale Snow Storage Site Development
LEADERSHIP INSIGHTS
See all insights