Location
Gitwinksihlkw, British Columbia
Expertise
Infrastructure
Indigenous Communities
Water
Water Treatment
Buildings
Building Structures
Share
The Village of Gitwinksihlkw is located northwest of the City of Terrace in BC.
The community traditionally relied on two upland creeks for its drinking water. Over the years, the community made several water impoundment improvements. However, frequent water shortages continued to occur, especially during the summer months when the creeks dried up. As a result, the village had to truck water into the community. The village wished to resolve these issues to provide adequate capacity for future water demands and a more reliable source of safe drinking water.
The Village engaged Associated Engineering to carry out preliminary design, detailed design, and construction engineering services for water supply and treatment improvements. We also prepared and administered the equipment procurement contract for pre-purchasing the water treatment equipment (sand-ballasted flocculation and sand filtration units) from the manufacturer.
Client
The Village of Gitwinksihlkw
Project Highlights
18.5l/s
maximum hydraulic capacity
The new water treatment plant has a maximum hydraulic capacity of 18.5 litres per second, and accommodates the variable water quality in the Nass River. This includes handling the fluctuating alkalinity, organic carbon and colour levels, and wide range of turbidity. To provide reliable water treatment and disinfection, a multi-barrier approach is deployed, including coagulation and ballasted flocculation, rapid sand filtration, ultraviolet treatment, and chlorination with sodium hypochlorite for disinfection. Treated water is then pumped up to an existing water reservoir.
People on this project
More Infrastructure Projects
See all projects
Water Treatment
Russell Binscarth Water Treatment Plant
Energy
District Energy – Blatchford Redevelopment
Infrastructure
Irrigation System Strategy
Infrastructure
Ice Engineering, Safety Services, and Road Management Plan
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Bridges
SkyTrain Grandview Cut Structural Upgrade
Infrastructure
Clayton Reservoir
Parks & Recreation
North Langford Turf Field
Infrastructure
Wildfire Infrastructure Rehabilitation Program
Land Development
Lethbridge Crossings Development
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Streetscaping
Langford Cultural District
Infrastructure
Municipal Incentives to Attract Downtown Investment
Environmental