The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Transportation
Glenmore Dam Utility Relocation

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Transportation
Mission Bridge Seismic Retrofit

Transportation
Yorkton Cycling Network

Transportation
Broadway Street Improvements

Transportation
Cold Lake CRISP

Roads
Highway 91/91A Queensborough and Howes Interchanges

Infrastructure
Yoho Bridge Concrete Design

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Casino Mine Access Road

Land Development
Royal Bay Subdivision

Streetscaping
Langford Cultural District

Airports
Vancouver International Airport Parallel Runway
LEADERSHIP INSIGHTS
See all insights