With the extensive fruit and grape production that occurs in Niagara-on-the-Lake, providing adequate support to local farmers regarding irrigation has become critical to economic viability.
At present, the Town of Niagara-on-the-Lake operates an expansive irrigation system that is tied into the Municipal Drainage system. It draws water from the Niagara River, Ontario Power Generation hydro reservoir and the St. Lawrence Seaway Canal. The system does not currently provide enough water to meet the local demand throughout the growing season, resulting in the use of potable water for irrigation and in some instances potable water theft.
Irrigation is generally practiced from May 15 to September 15, with most greenhouses beginning April 1 and continuing into December. Most farmers irrigate only if there are two consecutive weeks without rain during this period. Tender fruit farmers generally apply 38-51 mm of water per irrigation set, and sometimes up to 100 mm of water. The amount of water being applied is measured using rain gauges and irrigation is continued until the desired water is collected by the gauge. In general, grape growers irrigate less than tender fruit farmers, requiring as low as 25 mm of water. However, when applying water under dry conditions, grape growers will require a higher rate and longer duration of irrigation, thus directly competing for water from tender fruit growers and putting signification strain on the water supply.


Project Highlights
The Town of Niagara-on-the-Lake retained the services of Associated Engineering to develop an Irrigation System Strategy. The strategy will be the first comprehensive irrigation plan for the Town and will serve as a first step toward improving customer levels of service, long-term growth and sustainability, and state of good repair of the Town’s irrigation system.
More Infrastructure Projects
See all projects

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Infrastructure
Gold Bar Wastewater Treatment Plant

Transportation
Mission Bridge Seismic Retrofit

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Water Treatment
Russell Binscarth Water Treatment Plant

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Transportation
Seymour Canyon Suspension Bridge

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Buildings
Corix Biomass Energy Centre

Land Development
Royal Bay Subdivision

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Infrastructure
Greens on Gardiner

Environmental
Growth and Economic Development Strategy

Infrastructure
West Calgary Storm Sewer Relief

Infrastructure
Roads and Drainage Construction, Lake Babine Nation
LEADERSHIP INSIGHTS
See all insights