The City of St. Albert owns and operates three primary water supply facilities, the Oakmont Reservoir and Pump Station, the Sturgeon Heights Reservoir and Pump Station, and the Lacombe Park Reservoir and Pump Station.
The new Erin Ridge development area, located north of Oakmont, necessitated discussions on capacity upgrades required at the Oakmont Facility, in order to serve the domestic and fire flow requirements of the new development.
In 2013, the City retained Associated Engineering to manage the upgrade process. The deliverables included: population and water demand growth projections, fire storage and fire flow requirement calculations, distribution network modelling review, a pre-design report for the upgrades, development of a project management plan, and creation of the RFP for the vertical turbine pumps.


Project Highlights
To provide the recommended 10-year water demands, we recommended that the Oakmont Reservoir and Pump Station be upgraded to a new pump configuration consisting of four 160 L/s 250 HP pumps, and two 70 L/s 125 HP pumps.
More Building Mechanical Projects
See all projects

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades

Building Mechanical
Arbutus Water Treatment Plant

Infrastructure
Rosehill Reservoir Rehabilitation

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Buildings
Residuals Treatment Facility

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Buildings
Chief Aranazhi School Upgrades

Infrastructure
Livestock and Forage Centre of Excellence

Water
Fort Chipewyan Water Treatment Plant Expansion

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Water
Jericho Reservoir

Building Mechanical
Athabasca Regional Service Centre, Administration Building

Airports
Calgary Airport Glycol Treatment Facility

Building Mechanical