The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.
Project Highlights
More Bridges Projects
See all projects
Bridges
Burrard Bridge Rehabilitation
Bridges
Outlook Truss Bridge Assessment
Transportation
Don River Blvd. Bridge Rehabilitation
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Active Transportation
Salton Road Pedestrian and Cycle Bridge
Asset Management
South Fraser Perimeter Road – Bridge Structural Engineering Services
Transportation
Ray Gibbon Drive Twinning
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Asset Management
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
Casino Mine Access Road
Transportation
BC Earthquake Integrated Asset Management Plan
Bridges
Engineering services for Houston Forest Products
Bridges
Camrose Creek Bridge Replacement
Bridges
Nass River Bridge Replacement
Active Transportation