The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Infrastructure
East Brampton Trunk Sanitary Sewer Twinning
Transportation
Broadway Street Improvements
Parks & Recreation
Pexsisen Elementary School
Infrastructure
Kluskus Village Domestic Water System Improvements
Infrastructure
Minnedosa Community Housing
Bridges
SkyTrain Grandview Cut Structural Upgrade
Infrastructure
Glenmore Landfill Entrance
Bridges
Moody Street Overpass
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Water Treatment
Russell Binscarth Water Treatment Plant
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Environmental Assessment
Fischer-Hallman Road Environmental Assessment
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Containment Systems