Location
Outlook, Saskatchewan
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.


Project Highlights
More Infrastructure Projects
See all projects

Infrastructure
Agnico Eagle Heavy Haul Bridges

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Land Development
Blackwolf Community Development

Land Development
Royal Bay Subdivision

Transportation
Overlea Blvd. Bridge Rehabilitation

Environmental
Climate Change Risk Assessment

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Infrastructure
Highway 69 Twinning

Infrastructure
Buffalo Creek Culvert Replacement

Infrastructure
Fringe Area Development Assessment

Infrastructure
West Calgary Storm Sewer Relief

Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock

Infrastructure
Market Crossing Commercial Development

Transportation
Canmore Bridge Management

Infrastructure
Baxter Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights