Welland Water Treatment Plant

  • Welland WTP
  • Welland WTP
  • Welland WTP
  • Welland WTP

The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold. Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:

  • Preliminary Design
  • Detailed Design
  • Tendering
  • Contract Administration
  • SCADA system programming and Integration
  • Construction Inspection
  • Warranty Period Services

The major components of this assignment include upgrades in the following areas:

  • Disinfection (UV System and Chlorination)
  • High Lift Pump Station
  • Treated Water Storage Reservoir
  • Distribution Watermains
  • Electrical
  • Demolition of Existing Buildings (Plant 2)
  • Demolition of Existing Treated Water Storage Reservoir