Location
Welland, Ontario
Expertise
Water
Water Treatment
Water Supply, Storage, & Distribution
Electrical Instrumentation & Controls
Pump Stations
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services
Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects
Water Treatment
Russell Binscarth Water Treatment Plant
Infrastructure
Gitwinksihlkw Water Treatment Plant
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Infrastructure
Rosehill Reservoir Rehabilitation
Pump Stations
12th Avenue Drainage Pump Station
Water
Mill Creek Erosion Study
Water
Pitt River Inter-Tidal Habitat
Water
Jericho Reservoir
Environmental
Big Bend Master Drainage Plan
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Water
Japan Gulch Ultraviolet Disinfection Facility
Water Treatment
Fairmont Chateau Lake Louise Water Treatment Plant Upgrades
Infrastructure
Melville Water Treatment Plant
LEADERSHIP INSIGHTS
See all insights