Location
Welland, Ontario
Expertise
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services


Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects

Environmental
Big Bend Master Drainage Plan

Infrastructure
Gitwinksihlkw Water Treatment Plant

Water
Jericho Reservoir

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Water
Fort Chipewyan Water Treatment Plant Expansion

Water
Edmonton City-Wide Flood Mitigation Assessment, Phase 2 – Area B

Infrastructure
Rosehill Reservoir Rehabilitation

Building Mechanical
Powell River WWTP

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Water
Mill Creek Erosion Study

Environmental
Port of Vancouver – Climate Change Adaptation

Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades

Infrastructure
Melville Water Treatment Plant

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
LEADERSHIP INSIGHTS
See all insights