Location
Burnaby, British Columbia
Expertise
Infrastructure
Roads
Streetscaping
Traffic Engineering
Urban Drainage
Share
The Byrne and Marine Commercial Development in Burnaby is one of Metro Vancouver’s largest food, drug, general merchandise and apparel retail anchored shopping centres.
Associated Engineering was responsible for the design of on-site and off-site infrastructure for the development of the 12 ha commercial development site. The off-site design included 330 m of roadworks, 460 m of sanitary sewer and force mains, 460 m of water mains and 460 m of storm sewer. The on-site storm sewer design included the use of pervious aquapavers for all parking areas (3 ha), providing 5,000 m3 of on-site detention within the underground detention pond created by the use of a railway ballast layer ranging between 300 mm and 700 mm in depth. The design required liaison with the developer, architect, landscape architect, geotechnical sub-consultant, mechanical sub-consultant and the City of Burnaby, Engineering and Environmental Departments.

Client
City of Burnaby

Project Highlights
12ha
development
330m
roadworks
460m
sanitary sewer
460m
water mains
460m
storm sewer
Associated Engineering was further responsible for preparing Tender Documents and Construction Drawings, and were the Contract Administrators for the on-site and off-site civil works.
The design reflects the Big Bend area’s unique ecosystem while creating a sustainable architectural setting.
More Infrastructure Projects
See all projects

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction

Infrastructure
Big Dock and Water Front Area Redevelopment

Infrastructure
Gitwinksihlkw Water Treatment Plant

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Transportation
Glenmore Dam Utility Relocation

Infrastructure
Kennedale Snow Storage Site Development

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Streetscaping
Vanalman Avenue Upgrades

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Energy
Site C Clean Energy

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Airports
Christina Lake Infrastructure Upgrading

Infrastructure
Highway 69 Twinning
LEADERSHIP INSIGHTS
See all insights