For over 20 years ending in 1982, the Oakville Fourth Line Landfill in the Regional Municipality of Halton received the town’s waste.
Subsequently, the Region constructed a new toe drain and leachate pump station to more effectively manage the accumulating leachate and protect the surrounding environment. The management strategy for handling the leachate included recirculating it at the landfill and hauling the leachate off-site by tanker truck for treatment.
To eliminate the need to haul and off-load approximately 40,000 to 55,000 cubic metres of leachate per year from the closed landfill facility, the Region engaged Associated Engineering to complete the preliminary and detailed design for a new submersible wet well leachate pump station and 100 millimetre force main (twinned for redundancy), connecting the station to the adjacent Neyagawa sanitary sewer.


Project Highlights
Choosing the force main routing and pump station design involved evaluating numerous factors. These included the presence and location of contaminated fill, unforeseen waste disposal areas, boulder, debris, and refuse within the working limits. In addition, consideration was given to the variable nature of the fill material, which would be controlled by selecting a less steep trench side slope or by providing lateral support to the trench walls. Special consideration was also given to the overriding environmentally sensitive areas and minimizing adverse effects on surrounding wildlife habitats.
We also provided contract administration and inspection services throughout construction.
More Infrastructure Projects
See all projects

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Infrastructure
Glenmore Landfill Entrance

Infrastructure
Century Park

Infrastructure
Melville Water Treatment Plant

Transportation
Don River Blvd. Bridge Rehabilitation

Transportation
Moody Street Overpass

Containment Systems
Cell 3 East Halton Waste Management Site

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Infrastructure
Kluskus Village Domestic Water System Improvements

Infrastructure
Provincial Disaster Assistance Program

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan
LEADERSHIP INSIGHTS
See all insights