Since its founding in 1908, the City of Melville endured challenges providing reliable, quality drinking water for residents. The City’s surface water supply was proving challenging to treat and prone to droughts, requiring the City to add a supplemental groundwater supply. In 1989, the City implemented Canada’s first electrodialysis reversal (EDR) process to treat its highly mineralized groundwater supply.
In 2016, with this equipment near the end of its service life, SaskWater – the plant’s owner/operator – contracted Associated Engineering to design and oversee construction of a new water treatment plant using only groundwater. The new plant employs RO (reverse osmosis), which is comparatively, a more effective and widely adopted demineralization technology than EDR. The Associated design team tailored pre-treatment and post-treatment processes around the RO system to extend RO service life, thus decreasing overall operating costs, enhancing water quality, and safety for residents and preserving downstream infrastructure.
Associated Engineering’s design allowed construction and commissioning to proceed without unplanned water supply service disruptions while fully integrating existing non-plant infrastructure where possible. Initially located adjacent to the old facility, the new plant design facilitated raw water and treated water piping interconnections, including a challenging connection into the existing gunite reservoir. The new process incorporates wastewater retention and release, reducing environmental impact and greenhouse gas emissions from the former deep well injection system. Delivered on time and under budget, the water treatment plant provides Melville residents with affordable, high quality, sustainable, and reliable drinking water that supports growth, economic development, and quality of life.
Client
SaskWater
Technology
Reverse Osmosis
Completion
2022
Awards
Association of Consulting Engineering Companies SK, PINNACLE Award & Award of Excellence
Project Highlights
Class III
plant classification
4550
cubic metre reservoir
2
groundwater supply wells
30km
water supply pipeline
People on this project
More Infrastructure Projects
See all projects
Infrastructure
Baxter Bridge Rehabilitation
Bridges
Deh Cho Bridge, Quality Management Services
Environmental
Drinking Water System Improvements in Quaaout Community
Hydrotechnical
Medicine Hat Flood Assistance
Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction
Transportation
Cold Lake CRISP
Infrastructure
North Interceptor Sanitary Trunk
Transportation
Broadway Street Improvements
Transportation
Don River Blvd. Bridge Rehabilitation
Transportation
Granville Bridge Seismic Retrofit and Renewal
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Infrastructure
Drainage Improvement Study
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
Infrastructure