Location
EDMONTON, Alberta
Expertise
Infrastructure
Water
Pipelines
Structures
Share
After discovering several major issues at Trestle No. 3, EPCOR retained Associated Engineering to rehabilitate and replace the corroded steel pipe and fix erosion issues impacting the ground around the trestle.
The project team worked together to implement a series of innovative designs and construction methodologies to overcome the challenges posed by lack of access and the steep ravine slopes. Risks during construction were managed by using alternative construction methodologies allowing workers to safely traverse the steep slopes and provide protection from falling debris.

Client
EPCOR
Completion
2022
Awards
Consulting Engineering Alberta, Award of Merit

Project Highlights
1964
originally constructed
72m
length
23m
max height
900mm
steel pipe diameter
People on this project
More Infrastructure Projects
See all projects

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Environmental
Climate Change Risk Assessment

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Environmental
Tlichǫ Cultural Commons Digital Database

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Infrastructure
Raw Water Supply – Pipeline River Crossing

Infrastructure
Lakeshore Drive Redevelopment

Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Infrastructure
Minnedosa Community Housing

Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade

Environmental
Port of Vancouver – Climate Change Adaptation

Infrastructure
Big Dock and Water Front Area Redevelopment
LEADERSHIP INSIGHTS
See all insights