Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.


Project Highlights
More Infrastructure Projects
See all projects

Infrastructure
Greens on Gardiner

Infrastructure
Gold Bar Wastewater Treatment Plant

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Hydrotechnical
Medicine Hat Flood Assistance

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Land Development
Royal Bay Subdivision

Infrastructure
Buffalo Creek Culvert Replacement

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Transportation
Highway 17 at County Road 508 Interchange

Infrastructure
Minnedosa Community Housing

Infrastructure
Livestock and Forage Centre of Excellence

Streetscaping
Vanalman Avenue Upgrades

Infrastructure
West Calgary Storm Sewer Relief

Infrastructure
Baxter Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights









