Location
Welland, Ontario
Expertise
Water
Water Treatment
Water Supply, Storage, & Distribution
Electrical Instrumentation & Controls
Pump Stations
Electrical Instrumentation & Controls
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services


Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects

Energy
Solar Feasibility Study for Medicine Hat Reservoirs

Pump Stations
Horseshoe Slough Drainage Pump Station

Infrastructure
Rosehill Reservoir Rehabilitation

Pump Stations
Skyline Pump Station

Infrastructure
Gitwinksihlkw Water Treatment Plant

Water
Jericho Reservoir

Water
Japan Gulch Ultraviolet Disinfection Facility

Water
Fort Chipewyan Water Treatment Plant Expansion

Transportation
Kitsault Mine Access Road and Bridge Assessments

Energy
Fort McMurray Wastewater Treatment Plant – Instrumentation, Controls & Automation

Environmental
Big Bend Master Drainage Plan

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Infrastructure
Kluskus Village Domestic Water System Improvements

Water
Mill Creek Erosion Study
LEADERSHIP INSIGHTS
See all insights





