Location
Welland, Ontario
Expertise
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services


Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Water
Climate Change Rainfall Adaptation Strategy

Water
Yorkton West Storm Drainage Study

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Water
Jericho Reservoir

Transportation
Kitsault Mine Access Road and Bridge Assessments

Environmental
MacFarlane Creek Drainage Study

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Environmental
Port of Vancouver – Climate Change Adaptation

Infrastructure
Melville Water Treatment Plant

Water
Elbow River 2D Flood Modelling

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades

Infrastructure
Rosehill Reservoir Rehabilitation

Water
Mill Creek Erosion Study
LEADERSHIP INSIGHTS
See all insights