Location
Edmonton, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Active Transportation
Share
The City of Edmonton retained Associated Engineering to provide design and construction phase services for a replacement boardwalk structure within the Whitemud Creek Ravine.
The scope of work included an environmental assessment, new boardwalk design, tendering services, and construction phase services.
The boardwalk is 45 metres long and consists of a 3 metre wide timber walkway supported on steel members spaced at 3 metres along its length. Steel screw piles are used to support the superstructure.
An observation deck located at the midpoint of the structure provides trail users the opportunity to safely view the natural scenery.

Client
City of Edmonton

Project Highlights
45 metres
Length
3 metres
Width
People on this project
More Transportation Projects
See all projects

Transit
SkyTrain Fraser River Crossing North Approach Spans

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Transportation
Casino Mine Access Road

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Transportation Planning Studies

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Medicine Hat Boardwalk Replacements

Active Transportation
Highway 1 at Mountain Highway Interchange

Transportation
Northwest Territories ITS Program

Transportation
Don River Blvd. Bridge Rehabilitation

Transportation
Bobtail Forest Service Road Overpass

Infrastructure
Johnston Canyon Campground Upgrades

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Transportation
Vancouver International Airport Rainwater Harvesting

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process
LEADERSHIP INSIGHTS
See all insights









