Location
Richmond, British Columbia
Expertise
Transportation
Airports
Infrastructure
Sustainable Design
Share
The Vancouver Airport Authority set a goal of 30% reduction, from 2012 levels, in Sea Island’s potable water consumption by 2020.
Associated Engineering, 2020 Engineering, and Local Practice were engaged to assist the Airport Authority in this goal for their CORE Program, involving several terminal infrastructure improvements. Integration of a rainwater collection system into the CORE program helps the Airport Authority meet their commitment to excellence in safety, security, and environmental management.
The Vancouver Airport Authority has extensive sustainability goals that require a holistic problem solving approach, considering not only the technical requirements of each unique site, but the larger vision of long term water conservation and environmental stewardship. This project was an AE-led, holistically integrated team of experts on sustainability, water conservation and reuse, civil infrastructure and water treatment systems.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/BC.png)
Client
The Vancouver Airport Authority
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
33,000m3
rainwater
4000m3
fire protection reserve
84%
car washing water
This assignment required a robust process of stakeholder engagement, a comprehensive identification of requirements, an assessment of opportunities and a conceptual approach for water and rainwater management. The chosen rainwater harvesting system will initially collect 33,000 m3 per year of rainwater, provide a constant 4000 m3 in fire protection reserve storage and provide 84% of the car washing water demand. The system has the capacity to reduce municipal water used for the CORE Program’s total non-potable demands by 34%. The system provides the potential to increase resilience and report significant water savings in a targeted strategy to showcase leadership and results towards sustainability at YVR.
More Transportation Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/medicine-hat-transit-its-decision-support-tn.jpg)
Transportation
Medicine Hat Transit ITS Decision Support
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/valley-line-tn.jpg)
Transportation
Edmonton Valley Line – Stage 1
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/YYC-Glycol.jpg)
Airports
Calgary Airport Glycol Treatment Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/skytrain-thumb.jpg)
Transit
SkyTrain Fraser River Crossing North Approach Spans
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/dji_export_1657747250390-copy.jpg)
Transportation
Broadway Street Improvements
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/ice-engineering-and-ice-safety-for-tibbitt-contwoyto-winter-road-thumb.jpg)
Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/NIX_5169.jpg)
Transportation
Highway 7 Haney Bypass Intersection Improvements
![Project Image](https://www.ae.ca/wp-content/uploads/2023/08/NIX_2368.jpg)
Streetscaping
Vanalman Avenue Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/NIX_3142.jpg)
Bridges
Moody Street Overpass
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/thumbnail_bermuda_airport.jpg)
Transportation
Bermuda Runway Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2024/07/170stbridges-tn.jpg)
Transportation
170th Street over CN Rail Bridge Rehabilitations
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/DSC6346.jpg)
Airports
Nanaimo Airport Airfield Electrical Upgrading
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/YVR-Runway-Thumb.jpg)
Airports
Vancouver International Airport Parallel Runway
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/NIX_6957-copy.jpg)
Bridges
Coast Meridian Bridge
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_0817.jpg)
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
LEADERSHIP INSIGHTS
See all insights