Associated Engineering (AE) was retained by the Government of the Northwest Territories (GNWT) to undertake the planning, detailed design, and construction oversight for the Runway 06-24 Extension and airside civil infrastructure improvements at the Inuvik Mike Zubko Airport.
The airside runway, taxiway and apron pavements are showing considerable surficial distress relating to permafrost degradation. Previous geotechnical studies have concluded the original permafrost regime beneath the airport surface structures has changed. The runway extension scope of work involves undertaking the planning, design and construction of the proposed Runway 06-24 extension to 2743m (9000ft).
The scope includes the runway and strip, grading, drainage, granular base, pavement structure, relocation of NavCanada facilities, airfield electrical, pavement markings and aircraft turnarounds at each end of the runway. The scope importantly also includes undertaking climate change projections and developing climate design data inputs for the new runway taking future climate change into account.

Client
Government of the Northwest Territories

Project Highlights
9,000 feet
Runway extension
The Civil Infrastructure Improvements Project involves four major objectives widening the Runway Safety Area to current Transport Canada standards; widening Taxiway C to accommodate Aircraft Group Number (AGN) IV; improving airport surface drainage to direct it away from runway and taxiway infrastructure and prevent ponding water from impacting the permafrost regime and remediating the roughness on Taxiway D.
People on this project
More Transportation Projects
See all projects

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transportation
Battleford Truss Bridge Rehabilitation

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Pedestrian Bridge 151 Rehabilitation

Transit
SkyTrain Fraser River Crossing North Approach Spans

Airports
Nanaimo Airport Airfield Electrical Upgrading

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
Freegold Road Functional Plan

Infrastructure
Johnston Canyon Campground Upgrades

Transportation
Medicine Hat Transit ITS Decision Support

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
Ioco Road / Bedwell Bay Road Improvements

Transportation
Coast Meridian Overpass Detailed Inspection

Transportation
Overlea Blvd. Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights