To facilitate project delivery, design and construction of the West Calgary Ring Road was divided into two design-build packages.
Design-Build 1 from the Trans-Canada Highway to Old Banff Coach Road consisted of 20 bridge structures, two interchanges, three kilometres of highway, and three kilometres of highway reconstruction.
Design-Build 2 from Old Banff Coach Road to Highway 8 included eight bridge structures, four interchanges, seven kilometres of highway, and four kilometres of highway reconstruction.

Owner/Client
Alberta Transportation & Economic Corridors
Delivery Model
Design-Build-Finance-Operation-Maintain-P3
Services
Owner’s Engineer

Project Highlights
28
bridge structures
19km
highways
2023
completed
The project significantly reduces commute times for over 100,000 residents on the west side of Calgary, completes the connection of the Ring Road, and alleviates pressures on the City’s transportation network.
People on this project
More Alternative Delivery Projects
See all projects

Alternative Delivery
McKay River Bridge

Buildings
Residuals Treatment Facility

Infrastructure
Salton Road Pedestrian and Cycle Bridge

Alternative Delivery
Deh Cho Bridge

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Infrastructure
Johnson-Mariner Way Connector

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Transportation
Edmonton Valley Line – Stage 1

Bridges
Haisla Bridge Replacement

Infrastructure
Sea to Sky Highway – Bridge Structural Engineering Services

Infrastructure
Nass River Bridge Replacement

Alternative Delivery
Pitt River Bridge

Alternative Delivery
Regina Bypass

Infrastructure
Deh Cho Bridge, Quality Management Services
LEADERSHIP INSIGHTS
See all insights