Location
CHURCHILL, Manitoba
Expertise
Infrastructure
Transportation
Bridges
Share
With one of the few paved airfields in the Arctic, the Churchill Airport is essential for many services in the North.
Associated Engineering was contracted to deliver a long-term solution to surface deficiencies with the runway and taxiway. Using 3D scanning and other technology, Associated Engineering determined the underlying problem was permafrost deterioration caused by improper drainage. This issue had not been identified previously. The solution included drainage improvement and maintenance recommendations, asphalt treatment and application techniques, and installing monitoring cannisters in the runway. This work will advance research into new applications for northern paved and unpaved airstrips.

Client
Public Services and Procurement Canada and Transport Canada
Completion
2020
Awards
Association of Consulting Engineering Companies Manitoba, Award of Merit

Project Highlights
2803m
runway length
5.6km
distance from churchill
More Infrastructure Projects
See all projects

Infrastructure
Clayton Reservoir

Infrastructure
Gold Bar Wastewater Treatment Plant

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Infrastructure
Fringe Area Development Assessment

Infrastructure
Gregoire Sanitary Sewer

Infrastructure
Highway 69 Twinning

Downtown and Main Street Revitalization
West Rossdale Redevelopment

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
Overlea Blvd. Bridge Rehabilitation

Buildings
Riel Recreation Park Redevelopment

Transportation
Still Creek Pedestrian Bridge Replacement

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction

Infrastructure
Johnston Canyon Campground Upgrades

Transportation
184 Street and Yellowhead Trail Interchange
LEADERSHIP INSIGHTS
See all insights









