Location
Niagara-on-the-Lake, Ontario
Expertise
Infrastructure
Irrigation
Share
With the extensive fruit and grape production that occurs in Niagara-on-the-Lake, providing adequate support to local farmers regarding irrigation has become critical to economic viability.
At present, the Town of Niagara-on-the-Lake operates an expansive irrigation system that is tied into the Municipal Drainage system. It draws water from the Niagara River, Ontario Power Generation hydro reservoir and the St. Lawrence Seaway Canal. The system does not currently provide enough water to meet the local demand throughout the growing season, resulting in the use of potable water for irrigation and in some instances potable water theft.
Irrigation is generally practiced from May 15 to September 15, with most greenhouses beginning April 1 and continuing into December. Most farmers irrigate only if there are two consecutive weeks without rain during this period. Tender fruit farmers generally apply 38-51 mm of water per irrigation set, and sometimes up to 100 mm of water. The amount of water being applied is measured using rain gauges and irrigation is continued until the desired water is collected by the gauge. In general, grape growers irrigate less than tender fruit farmers, requiring as low as 25 mm of water. However, when applying water under dry conditions, grape growers will require a higher rate and longer duration of irrigation, thus directly competing for water from tender fruit growers and putting signification strain on the water supply.


Project Highlights
The Town of Niagara-on-the-Lake retained the services of Associated Engineering to develop an Irrigation System Strategy. The strategy will be the first comprehensive irrigation plan for the Town and will serve as a first step toward improving customer levels of service, long-term growth and sustainability, and state of good repair of the Town’s irrigation system.
More Infrastructure Projects
See all projects

Streetscaping
Langford Cultural District

Hydrotechnical
Medicine Hat Flood Assistance

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Environmental
Community-Based Monitoring Software Project

Containment Systems
Cell 3 East Halton Waste Management Site

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Environmental
Drinking Water System Improvements in Quaaout Community

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Infrastructure
Raw Water Supply – Pipeline River Crossing

Infrastructure
Century Park

Infrastructure
Mosquito Creek Marina Spirit Trail

Infrastructure
Kahkewistahaw Landing
LEADERSHIP INSIGHTS
See all insights










