Location
Yellowknife, NWT
Expertise
Infrastructure
Highways
Share
The Tłı̨chǫ All-Season Road P3 project and consists of the design, finance, operation, maintenance and rehabilitation (DBFOM) of a 97 kilometre, all-season gravel highway.
Associated Engineering assisted in the procurement of services by providing advisory and technical input into the development of Phase 1 – Request for Qualifications (RFQ) and Phase 2 – Request for Proposal (RFP).
Phase 1 – Request for Qualifications:
- Provided input in the development of the RFQ and evaluation criteria, weighting criteria, scoring sheets, and evaluation training
- Participated in Industry Day in Yellowknife
Project Highlights
Phase 2 – Request for Proposal:
- Provided technical input in to the development of RFP technical submission and evaluation criteria, and process for Collaborative Meetings
- Assisted in the development of the output specifications and technical documents as part of the RFP and Project Agreement
- Assisted with the preparation of clarifications and addendums
- Participated in the Collaborative Meetings with proponent teams
- Assisted in response to Requests for Information from proponents
- Provided individual review and assessment of technical proposals
- Participated in consensus review with other committee members
- Established a detailed list of technical irregularities for the Proponent’s technical proposals
More Infrastructure Projects
See all projects
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Containment Systems
Cell 3 East Halton Waste Management Site
Containment Systems
Asquith Landfill Decomissioning
Environmental
Growth and Economic Development Strategy
Infrastructure
Clayton Reservoir
Transit
SkyTrain Fraser River Crossing North Approach Spans
Infrastructure
North Interceptor Sanitary Trunk
Infrastructure
Kluskus Village Domestic Water System Improvements
Infrastructure
Oakville Fourth Line Closed Landfill
Transportation
Don River Blvd. Bridge Rehabilitation
Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Infrastructure
Kennedale Snow Storage Site Development
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Infrastructure