Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.


Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects

Transportation
Haisla Bridge Replacement

Infrastructure
Raw Water Supply – Pipeline River Crossing

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement

Environmental
Tlichǫ Cultural Commons Digital Database

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Vancouver International Airport Rainwater Harvesting

Environmental
Climate Change Risk Assessment

Infrastructure
North Kildonan Feedermain

Infrastructure
Gold Bar Wastewater Treatment Plant

Water
Fort Chipewyan Water Treatment Plant Expansion

Transportation
Coast Meridian Overpass

Parks & Recreation
North Langford Turf Field

Infrastructure
Churchill Airport Runway Upgrades

Hydrotechnical
Medicine Hat Flood Assistance
LEADERSHIP INSIGHTS
See all insights