Location
Cache Creek, British Columbia
Expertise
Infrastructure
Community Resilience
Share
The Village of Cache Creek sustained substantial damage due to the 1 in 100-year heavy rainfall event and resulting flash flooding event of May 23rd, 2015.
NOR•EX Engineering provided disaster response, recovery and strategy development.
Five days following the event – working on behalf of Emergency Management British Columbia (EMBC) and then for the Village of Cache Creek directly – NOR•EX Engineering assumed the operations lead of the Emergency Operations Centre (EOC); developed a transition plan from EOC to a Recovery Operations Centre, and developed a recovery plan on behalf of the Village of Cache Creek.


Project Highlights
These activities were required to successfully transition from emergency response into a short and long term recovery program. NOR•EX Engineering worked with senior Village of Cache Creek administration to develop a strategy to expedite and prioritize immediate response activities, managed the EOC, establish an effective communication channel with EMBC, as well as coordinating the damage assessments required to create and submit a recovery plan.
More Infrastructure Projects
See all projects

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Granville Bridge Seismic Retrofit and Renewal

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan

Infrastructure
Clayton Reservoir

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Buildings
Riel Recreation Park Redevelopment

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services

Transportation
Don River Blvd. Bridge Rehabilitation

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Transportation
Still Creek Pedestrian Bridge Replacement

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement

Streetscaping
Vanalman Avenue Upgrades
LEADERSHIP INSIGHTS
See all insights









