Location
Tachet, British Columbia
Expertise
Infrastructure
Roads
Urban Drainage
Share
In recent years, Tachet has experienced water ingress and severe mould problems in a number of houses.
Issues were attributed to poor drainage, which allowed stormwater to flow uncontrollably into many homes. The community needed to develop a comprehensive drainage plan and identify a solution to move water away from affected homes. The community also required road improvements, such as roadside drainage ditches, driveway culverts, and roadway culverts, and wanted to correct the poor drainage caused by the deterioration of the gravel road surface. Lake Babine Nation retained Associated Engineering to complete a comprehensive drainage plan and identify improvements.

Client
Lake Babine Nation

Project Highlights
The existing community drainage system was limited to a single 450 millimetre diameter culvert. The remaining drainage consisted of uncontrolled overland flow routes along the road surfaces and through residential lots and natural areas. The drainage system left the community susceptible to uncontrolled stormwater flow on roadways, driveways, and residential lots; erosion and flooding of roadways and natural surfaces; and potential sediment concerns to receiving watercourses. Following the development of the drainage plan, Lake Babine Nation engaged Associated Engineering to complete the preliminary and detailed design and oversee construction of the community’s drainage and roadway improvements.
People on this project
More Infrastructure Projects
See all projects

Bridges
SkyTrain Grandview Cut Structural Upgrade

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction

Transportation
Glenmore Dam Utility Relocation

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Parks & Recreation
North Langford Turf Field

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Infrastructure
North Kildonan Feedermain

Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement

Infrastructure
East Brampton Trunk Sanitary Sewer Twinning

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Infrastructure
Century Park

Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
LEADERSHIP INSIGHTS
See all insights