Location
Russell, Manitoba
Expertise
Water Treatment
Water
Water Supply, Storage, & Distribution
Pipelines
Building Structures
Infrastructure
Share
Associated Engineering (AE) was retained by the Manitoba Water Services Board and the Municipality of Russell Binscarth to design a new Regional Water Treatment Plant in the Town of Russell to provide a safe and reliable potable water supply to the region.
The Russell – Binscarth Regional Water Treatment Plant was constructed in 2017 and began providing treated water to Russell, Binscarth, Angusville, Rossburn, and Gambler First Nation in 2018/19. The plant draws water from two 300mm ground water wells, and supplies treated water to the region, including to Rossburn, which is over 45km away.
Client
Municipality of Russell Binscarth
Project Highlights
45
L/s Treated Water
More Water Treatment Projects
See all projects
Environmental
Drinking Water System Improvements in Quaaout Community
Computational Fluid Dynamics Analysis
Process Investigation and Computation Fluid Dynamics Modeling
Water Treatment
Fort McMurray Wildfire Response
Irrigation
Red Deer Water Treatment Plant Intake
Water Treatment
Fairmont Chateau Lake Louise Water Treatment Plant Upgrades
Electrical Instrumentation & Controls
Bearspaw Water Treatment Plant Electrical Upgrades
Wastewater Collection & Storage
Live Online Water and Wastewater Operator Training
Climate Change Adaptation & Mitigation
Toronto Water Quality Master Plan
Water
Fort Chipewyan Water Treatment Plant Expansion
Water Treatment
Glenmore Water Treatment Plant Upgrades
Buildings
Belle River Water Treatment Plant
Environmental
Climate Change Risk Assessment
Pump Stations
Oakville Water Purification Plant
Infrastructure
Gitwinksihlkw Water Treatment Plant
Electrical Instrumentation & Controls