Metro Vancouver provides water to over 2.1 million residents throughout the Lower Mainland.
As part of the Surrey-Langley Water Supply Scheme, the District is proposing to build a new Maple Ridge/Barnston Pump Station. Associated Engineering was retained to provide services for the preliminary design, detailed design, equipment procurement, tender preparation, as well as consulting services during the tender process, construction, and post-construction. Providing an eventual peak hour flow of over 400 ML/d, this pump station will be by far the largest municipal water distribution pump station in the Province. Located by the north ramp of Golden Ears Bridge, it will also have a major role in overall water supply scheme for a number of municipalities including Langley, Maple Ridge and Surrey.
The $25 Million project embraces the Sustainable Region Initiative (SRI) that supports the overall sustainability of projects and the reduction of impacts on the environment resulting from implementation of projects.


Project Highlights
400ML/d
peak hour flow
$25M
project
More Pump Stations Projects
See all projects

Pump Stations
Avenue H Reservoir and Pump Station

Water
Welland Water Treatment Plant

Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power

Pump Stations
Horseshoe Slough Drainage Pump Station

Pump Stations
Skyline Pump Station

Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station

Energy
Process Energy Audits

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Pump Stations
Oakville Water Purification Plant

Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling

Infrastructure
Forest Lawn Lift Station

Environmental Engineering
Regina Hauled Waste Receiving Station

Buildings
Riel Recreation Park Redevelopment

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Building Mechanical