Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Location
Chilliwack, British Columbia
Expertise
Bridges
Structures
Share
The BC Ministry of Forests and Range retained Associated Engineering to inspect a total of 184 structures in the Chilliwack Forest District and the Chinook BCTS Business Area.
The structures varied from multi-span steel, concrete and log structures to major culverts.
The inspection involved visual and physical (non-destructive) testing of log stringer, steel, concrete bridge and culvert components for structural deficiencies.
The inspection data was entered into digital Inspection Data Forms in Microsoft Access format for download into the Coast Forest Region Bridge Register. Each report included GPS coordinates, structural deficiencies, measurements to facilitate load rating, date of next inspection and photos.
Project Highlights
More Bridges Projects
See all projects
Bridges
Burrard Bridge Rehabilitation
Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments
Transportation
Pitt River Bridge
Bridges
Miette Hot Springs Culvert and Bridge Replacement
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Transportation
Ray Gibbon Drive Twinning
Bridges
Battle Creek Road Bridge Replacement
Transportation
Still Creek Pedestrian Bridge Replacement
Bridges
Deh Cho Bridge
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Bridges
Beaverdams Road and Power Canal Bridges
Bridges
Pedestrian Bridge 151 Rehabilitation
Bridges
Nass River Bridge Replacement
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Transportation
BC Earthquake Integrated Asset Management Plan
LEADERSHIP INSIGHTS
See all insights