The Government of the Northwest Territories retained Associated Engineering to evaluate the existing condition, load rate, and prepare life-cycle cost estimates for retrofit and replacement options for the Frank Channel and Kakisa River Bridges.
Both bridges are critical elements of the highway network in the Northwest Territories.
Associated Engineering conducted a close proximity inspection of both structures using a specialized inspection truck. Prior to conducting the inspections, a 3-D finite element model was created to evaluate the load rating based on CAN/CAS-S6-00 and identify any members that may be over-stressed or subject to high fatigue cycles. This work was then used to optimize the ultrasonic integrity inspections of the truss members.
We prepared a report that provided a Life Cycle Cost summary of the retrofit and replacement options, including total costs to 2053, salvage value, and expected residual life.

Client
The Government of the Northwest Territories

Project Highlights
More Transportation Projects
See all projects

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering

Transportation
Highway 16 SAFE Corridor

Transportation
Calgary Airport Runway and Tunnel

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transportation
Mission Bridge Seismic Retrofit

Transportation
Yorkton Cycling Network

Transportation
Edmonton Valley Line – Stage 1

Transportation
Bermuda Runway Rehabilitation

Transportation
Duggan Bridge Replacement

Alternative Delivery
McKay River Bridge

Transportation
Waterton National Park Trail Bridge Replacements

Transit
SkyTrain Fraser River Crossing North Approach Spans

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Airports
Calgary Airport Glycol Treatment Facility

Alternative Delivery
Pitt River Bridge
LEADERSHIP INSIGHTS
See all insights