Location
Kakiska, NWT
Expertise
Bridges
Share
The Government of the Northwest Territories retained Associated Engineering to evaluate the existing condition, load rate, and prepare life-cycle cost estimates for retrofit and replacement options for the Frank Channel and Kakisa River Bridges.
Both bridges are critical elements of the highway network in the Northwest Territories.
Associated Engineering conducted a close proximity inspection of both structures using a specialized inspection truck. Prior to conducting the inspections, a 3-D finite element model was created to evaluate the load rating based on CAN/CAS-S6-00 and identify any members that may be over-stressed or subject to high fatigue cycles. This work was then used to optimize the ultrasonic integrity inspections of the truss members.
We prepared a report that provided a Life Cycle Cost summary of the retrofit and replacement options, including total costs to 2053, salvage value, and expected residual life.
Client
The Government of the Northwest Territories
Project Highlights
More Bridges Projects
See all projects
Transportation
Don River Blvd. Bridge Rehabilitation
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Bridges
Willingdon Avenue Overpass Seismic Retrofit
Transportation
Overlea Blvd. Bridge Rehabilitation
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Asset Management
Kitsault Mine Access Road and Bridge Assessments
Transportation
Still Creek Pedestrian Bridge Replacement
Bridges
Knight Street Bridge Upgrading
Bridges
Seymour Canyon Suspension Bridge
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Active Transportation
Salton Road Pedestrian and Cycle Bridge
Transportation
Bobtail Forest Service Road Overpass
Bridges
SkyTrain Grandview Cut Structural Upgrade
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Bridges