Location
Alice Arm, British Columbia
Expertise
Share
Avanti Mining Inc. was in the early stage of developing their core asset, the Kitsault Molybdenum Mine, that is thought to sit on one of the highest-grade molybdenum deposits worldwide.
This formerly producing mine has established power, utility, road and ocean access infrastructure that needed to be assessed for its ability to transport construction and mining equipment to the site.
Associated Engineering carried out road assessments on the Nass-FSR, Nass-Kinskuch, Nass-Kwinitahl and the Alice Arm Roads. In addition, our team conducted bridge and culvert assessments along the entire mine access route. Our assessment of the mine access route considered road user safety, road surface conditions geometry (horizontal and vertical alignment), existing gradients, roadway drainage, and bridges and culverts.
From the assessments, we recommended road and bridge upgrades that would improve the road suitability for mine-related traffic. We also suggested regular maintenance and operational protocols that would keep the road in a safe and driveable condition.

Client
Avanti Mining Inc.

Project Highlights
More Transportation Projects
See all projects

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering

Transportation
Highway 16 SAFE Corridor

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
Ioco Road / Bedwell Bay Road Improvements

Transportation
Shell Canterra Road

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Airports
Nanaimo Airport Airfield Electrical Upgrading

Transportation
Broadway Street Improvements

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transportation
Northwest Territories ITS Program

Transportation
Frank Channel and Kakisa River Bridge Assessment

Transportation
Whitemud Creek Oxbow Boardwalk

Environmental
Highway 40 Emergency Flood Reconstruction

Transportation
7 Avenue S. Bike Boulevard

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements
LEADERSHIP INSIGHTS
See all insights











