Location
Oakville, Ontario
Expertise
Share
For over 20 years ending in 1982, the Oakville Fourth Line Landfill in the Regional Municipality of Halton received the town’s waste.
Subsequently, the Region constructed a new toe drain and leachate pump station to more effectively manage the accumulating leachate and protect the surrounding environment. The management strategy for handling the leachate included recirculating it at the landfill and hauling the leachate off-site by tanker truck for treatment.
To eliminate the need to haul and off-load approximately 40,000 to 55,000 cubic metres of leachate per year from the closed landfill facility, the Region engaged Associated Engineering to complete the preliminary and detailed design for a new submersible wet well leachate pump station and 100 millimetre force main (twinned for redundancy), connecting the station to the adjacent Neyagawa sanitary sewer.


Project Highlights
Choosing the force main routing and pump station design involved evaluating numerous factors. These included the presence and location of contaminated fill, unforeseen waste disposal areas, boulder, debris, and refuse within the working limits. In addition, consideration was given to the variable nature of the fill material, which would be controlled by selecting a less steep trench side slope or by providing lateral support to the trench walls. Special consideration was also given to the overriding environmentally sensitive areas and minimizing adverse effects on surrounding wildlife habitats.
We also provided contract administration and inspection services throughout construction.
More Infrastructure Projects
See all projects

Transportation
Don River Blvd. Bridge Rehabilitation

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Streetscaping
Nigel Valley Public Spaces

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Buildings
Riel Recreation Park Redevelopment

Transportation
Kitsault Mine Access Road and Bridge Assessments

Environmental
Climate Change Risk Assessment

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Bridges
Muskeg River Bridge

Environmental
Splatsin Eagle River Compensation Site Identification Site

Transportation
St. Johns Street Redesign – Active Transportation and Pedestrian Accessibility Improvements

Infrastructure
Churchill Airport Runway Upgrades

Bridges
Bon Accord Pedestrian Bridge

Environmental
37 Street SW Storm Trunk Relocation
LEADERSHIP INSIGHTS
See all insights