The Regional Municipality of Wood Buffalo identified the need for additional residential development within the Hamlet of Fort Chipewyan to accommodate future growth in the community.
Associated Engineering assisted the Municipality with the review of alternative servicing options and costs for the proposed development.
The Hamlet of Fort Chipewyan presented a number of unique geographic and geologic challenges for the design and construction of municipal services. These challenges included:
- The remote location that limits the local availability of construction contractors, equipment and materials.
- Limited access to the area requiring seasonal mobilization of equipment via the winter road from Fort McMurray, barge transport or air cargo.
- Ground conditions consisting of very shallow hard bedrock that requires blasting for installation of underground utilities.


Project Highlights
As a result, development within the Hamlet requires unique engineering consideration, such as: water and sewer mains typically built within the frost zone, a looped water system to enable ongoing circulation, ongoing low flow into the sewer system, above ground utilities, and surface drainage. Our engineering analysis considered these local needs which impact design criteria, construction methods, costs and materials.
To prepare Concept Plans for Residential Little Lake Expansion, the Associated Engineering completed the following tasks:
- Review of existing infrastructure systems to determine available capacity
- Preparation of design criteria
- Development of a number of servicing options considering development scenarios and different levels of service
- Capital and operating costs comparisons.
More Infrastructure Projects
See all projects

Energy
Site C Clean Energy

Environmental
Climate Change Risk Assessment

Infrastructure
Gregoire Sanitary Sewer

Infrastructure
West Calgary Storm Sewer Relief

Transportation
Haisla Bridge Replacement

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Transportation
Coast Meridian Overpass

Infrastructure
Rosehill Reservoir Rehabilitation

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Infrastructure
Roads and Drainage Construction, Lake Babine Nation

Airports
Christina Lake Infrastructure Upgrading

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Infrastructure
Tsawwassen Mills Mall

Streetscaping
Vanalman Avenue Upgrades

Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
LEADERSHIP INSIGHTS
See all insights