With the extensive fruit and grape production that occurs in Niagara-on-the-Lake, providing adequate support to local farmers regarding irrigation has become critical to economic viability.
At present, the Town of Niagara-on-the-Lake operates an expansive irrigation system that is tied into the Municipal Drainage system. It draws water from the Niagara River, Ontario Power Generation hydro reservoir and the St. Lawrence Seaway Canal. The system does not currently provide enough water to meet the local demand throughout the growing season, resulting in the use of potable water for irrigation and in some instances potable water theft.
Irrigation is generally practiced from May 15 to September 15, with most greenhouses beginning April 1 and continuing into December. Most farmers irrigate only if there are two consecutive weeks without rain during this period. Tender fruit farmers generally apply 38-51 mm of water per irrigation set, and sometimes up to 100 mm of water. The amount of water being applied is measured using rain gauges and irrigation is continued until the desired water is collected by the gauge. In general, grape growers irrigate less than tender fruit farmers, requiring as low as 25 mm of water. However, when applying water under dry conditions, grape growers will require a higher rate and longer duration of irrigation, thus directly competing for water from tender fruit growers and putting signification strain on the water supply.


Project Highlights
The Town of Niagara-on-the-Lake retained the services of Associated Engineering to develop an Irrigation System Strategy. The strategy will be the first comprehensive irrigation plan for the Town and will serve as a first step toward improving customer levels of service, long-term growth and sustainability, and state of good repair of the Town’s irrigation system.
More Infrastructure Projects
See all projects

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Infrastructure
Glenmore Landfill Entrance

Environmental
Splatsin Eagle River Compensation Site Identification Site

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Infrastructure
Yoho Bridge Concrete Design

Infrastructure
Churchill Airport Runway Upgrades

Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock

Streetscaping
Langford Cultural District

Infrastructure
Sea to Sky Highway – Bridge Structural Engineering Services

Transportation
Highway 17 at County Road 508 Interchange

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Buildings
Corix Biomass Energy Centre

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
LEADERSHIP INSIGHTS
See all insights