Associated is the environmental team for the Valley Line LRT project.
The alignment extends 13.1 kilometres from Mill Woods to downtown Edmonton, with a significant crossing over the North Saskatchewan River.
This is the largest P3 project undertaken by the City of Edmonton and is valued at $2.2 billion. As part of the design and construction team, Associated is responsible for all regulatory application and approvals from Federal, Provincial and Municipal agencies for the entire alignment. Associated also developed the project environmental compliance matrix for all environmental aspects of the project.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Alberta.png)
Client
City of Edmonton
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
$2.2B
value
More Environmental Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_2322.jpg)
Environmental
Port of Vancouver – Climate Change Adaptation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/silverberry-secure-landfill-4.jpg)
Containment Systems
Silverberry Secure Landfill
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/aquatera-01.jpg)
Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/regina-bypass-environmental-tn.jpg)
Environmental Planning
Regina Bypass – Environmental Services
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/blackmud-creek-thumb.jpg)
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/tn7f27a9391b316d6b9fc9ff00001037d2.jpg)
Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/tnc91da9391b316d6b9fc9ff00001037d2.jpg)
Environmental
Data System Planning
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/Pitt-River-Inter-Tidal-Habitat-tn.jpg)
Water
Pitt River Inter-Tidal Habitat
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/lwmp-thumb.jpg)
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/watershed-resilience-and-restoration-thumb.jpg)
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/teck-coal-thumb.jpg)
Environmental
Environmental Assessments, Southeast BC
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/phase-ii-esa-tn.jpg)
Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/cmb-software-tn.jpg)
Environmental
Community-Based Monitoring Software Project
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/deh-cho-bridge-environmental-tn.jpg)
Environmental
Deh Cho Bridge, Environmental Services
![Project Image](https://www.ae.ca/wp-content/uploads/2023/11/meadow-valley-1.jpg)
Environmental
Meadow Valley Groundwater Availability Study
LEADERSHIP INSIGHTS
See all insights
![](https://www.ae.ca/wp-content/uploads/2024/03/whitehorse-900.jpg)
![](https://www.ae.ca/wp-content/uploads/2024/04/trestle-1.jpg)