The Still Creek Pedestrian Bridge located in the northwestern portion of Burnaby Lake Regional Park, forms an important connection within the park drawing over 300,000 visitors per year.
Metro Vancouver retained Associated Engineering to provide engineering services for replacing the existing bridge with a prefabricated superstructure to improve freeboard and design capacity.
The project posed a number of challenges that included limited site access, poor ground conditions, highly compressible soils, and sensitive environmental habitat. We reviewed options for construction access and staging, including trail upgrades/ground improvements to support heavy equipment, installation with a heavy lift helicopter or accessing the site and installation using sectional barges. Helical piles with a cast-in-place pile cap was selected as the bridge foundation as the piles could be installed with relatively lightweight equipment with minimum impact and disturbance to the surrounding environment.

Client
Metro Vancouver

Project Highlights
300,000
visitors
A prefabricated aluminum truss superstructure was selected to minimize overall weight and allow flexibility for the installation method chosen by the contractor. The successful contractor eventually selected to install the prefabricated bridge using a heavy lift helicopter. We provided services during construction that included environmental auditing of the contractor’s EMP, reviewing contractor submittals and daily construction inspection sheets to ensure compliance with the design and specifications.
More Transportation Projects
See all projects

Transportation
St. Albert Transportation Master Plan

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Transportation
Highway 16 SAFE Corridor

Transportation
John Hextall Bridge Rehabilitation

Transportation
Vancouver International Airport Rainwater Harvesting

Transportation
Freegold Road Functional Plan

Transportation
Glenmore Dam Utility Relocation

Transportation
Waterton National Park Trail Bridge Replacements

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Transportation Planning Studies

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
170th Street Pedestrian Bridge

Transportation
Broadway Street Improvements
LEADERSHIP INSIGHTS
See all insights