Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Infrastructure
Mooney Forest Service Road
Infrastructure
North Kildonan Feedermain
Energy
District Energy – Blatchford Redevelopment
Bridges
Engineering services for Houston Forest Products
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Infrastructure
Minnedosa Community Housing
Infrastructure
Glenmore Landfill Entrance
Active Transportation
Highway 1 at Mountain Highway Interchange
Airports
Christina Lake Infrastructure Upgrading
Transportation
Granville Bridge Seismic Retrofit and Renewal
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Environmental
Growth and Economic Development Strategy
Parks & Recreation
North Langford Turf Field
Infrastructure
Clayton Reservoir
Infrastructure