The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.


Project Highlights
More Infrastructure Projects
See all projects

Infrastructure
Rosehill Reservoir Rehabilitation

Infrastructure
East Brampton Trunk Sanitary Sewer Twinning

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Transportation
Highway 17 at County Road 508 Interchange

Infrastructure
Gregoire Sanitary Sewer

Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade

Transportation
184 Street and Yellowhead Trail Interchange

Transportation
Don River Blvd. Bridge Rehabilitation

Infrastructure
Oakville Fourth Line Closed Landfill

Bridges
Engineering services for Houston Forest Products

Infrastructure
Mosquito Creek Marina Spirit Trail

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Downtown and Main Street Revitalization
West Rossdale Redevelopment
LEADERSHIP INSIGHTS
See all insights