Location
Yellowknife, NWT
Expertise
Transportation
Share
The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Active Transportation
Highway 1 at Mountain Highway Interchange

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Pioneer Pedestrian Bridge

Transportation
Casino Mine Access Road

Infrastructure
Highway 69 Twinning

Streetscaping
Vanalman Avenue Upgrades

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
Northwest Territories ITS Program

Transportation
Bellevue Creek Bridge

Transportation
Vancouver International Airport Rainwater Harvesting

Streetscaping
Langford Cultural District

Transportation
Ray Gibbon Drive Twinning

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transportation
170th Street Pedestrian Bridge
LEADERSHIP INSIGHTS
See all insights








