Associated Engineering was retained by the City of Burnaby to complete a Master Drainage Plan (MDP) to help the City to effectively manage stormwater and flooding conditions in the study area.
The Big Bend MDP focusses on the Fraser River floodplain located between Burnaby’s South Slope and the Fraser River. Drainage of the study area is affected by tidally influenced water levels in the Fraser River. In the future, climate change impacts, including changes to precipitation patterns and projected sea level rise of 1 m in magnitude or more by the year 2100, will increase the risk of flooding. The objective of the MDP is to efficiently evaluate the capacity of the existing drainage system and quantify the impact of flooding in the Big Bend study area.

Client
City of Burnaby

Project Highlights
A hydraulic 1D/2D computer model was created using MIKE-FLOOD, MIKE-URBAN and MIKE-21 FM to represent the storm system for the study area. MIKE-21 FM was used to model the major system (overland flow) in 2D. The 1D model was utilized to model components such as small and medium natural waterways, pipes, ditches, culverts, stormwater ponds, pump stations and flow control structures. The 2D model, on the other hand, contains all major topographic features, such as roads within the street network and adjacent properties, railways, channels and dikes so that overland flooding and surface conveyance will represent the current topographic condition. The benefit of this approach is that it provides the City with information on where the uncollected or surcharged water goes when it flows through the project area.
People on this project
More Environmental Projects
See all projects

Buildings
Climate Change Risk Assessment for Buildings

Environmental
Meadow Valley Groundwater Availability Study

Environmental Planning
Regina Bypass – Environmental Services

Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study

Environmental
37 Street SW Storm Trunk Relocation

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Sustainable Management
Environmental Management System and Legislative Compliance Assessment

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization
LEADERSHIP INSIGHTS
See all insights