Location
Thorold, Ontario
Expertise
Bridges
Share
Ontario Power Generation constructed Beaverdams Road Bridge and Power Canal Bridge across Lake Gibson in 1947 to provide access to the Decew Falls Power Generating Station.
Lake Gibson is used primarily for Power Generation at the Decew Falls and NF23 Power Generation Stations. Lake Gibson was formed when the land was flooded by the Welland Canal; water elevations are controlled to suit power generation requirements.
As the bridges are located in the City of Thorold, west of Niagara Falls in southern Ontario, the Regional Municipality of Niagara has shared responsibilities for maintenance and rehabilitation of the bridges with Ontario Power Generation.

Client
The Region of Niagara

Project Highlights
In 2013, the Region of Niagara recognized that both bridges had reached the end of their service lives, and needed to be replaced. The Region retained Associated Engineering as prime consultant to replace the two structures. Our project team completed a Schedule C Class Environmental Assessment, preliminary design, detailed design, and construction administration services to replace both structures. The designs included environmental offsetting plans for local wildlife in the area. Environmental offsetting plans were required by the Department of Fisheries and Oceans in order to mitigate the environmental impact of widening the causeway approaches to each of the bridges.
More Bridges Projects
See all projects

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Bridges
Muskeg River Bridge

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
Bobtail Forest Service Road Overpass

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Bridges
Yoho Bridge Concrete Design

Bridges
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area

Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services

Bridges
Frank Channel and Kakisa River Bridge Assessment

Bridges
Sucker River Bridge Replacement

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transportation
Whitemud Creek Oxbow Boardwalk

Bridges
Willingdon Avenue Overpass Seismic Retrofit

Bridges
Battle Creek Road Bridge Replacement

Bridges
Alexandra Bridge Deck Rehabilitation and Seismic Retrofit
LEADERSHIP INSIGHTS
See all insights



