Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.


Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects

Streetscaping
Vanalman Avenue Upgrades

Bridges
Engineering services for Houston Forest Products

Infrastructure
Century Park

Water
Jericho Reservoir

Infrastructure
Kennedale Snow Storage Site Development

Infrastructure
Raw Water Supply – Pipeline River Crossing

Transportation
Vancouver International Airport Rainwater Harvesting

Downtown and Main Street Revitalization
West Rossdale Redevelopment

Infrastructure
Tsawwassen Mills Mall

Infrastructure
Melville Water Treatment Plant

Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services

Infrastructure
Municipal Incentives to Attract Downtown Investment

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
LEADERSHIP INSIGHTS
See all insights