Location
Lethbridge, Alberta
Expertise
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.

Client
City of Lethbridge

Project Highlights
More Transportation Projects
See all projects

Bridges
Rossdale Bridge Rehabilitation

Transportation
Bellevue Creek Bridge

Infrastructure
Highway 69 Twinning

Transportation
LNG Canada Heavy Haul Bridges

Bridges
Granville Bridge Seismic Retrofit and Renewal

Transportation
Highway 17 at County Road 508 Interchange

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Infrastructure
Johnston Canyon Campground Upgrades

Transit
SkyTrain Fraser River Crossing North Approach Spans

Transportation
Don River Blvd. Bridge Rehabilitation

Transportation
Medicine Hat Boardwalk Replacements

Transportation
Pedestrian Bridge 151 Rehabilitation

Transportation
Coast Meridian Overpass

Transportation
Battleford Truss Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights










