The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.

Client
NOR•EX Engineering

Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects

Energy
Site C Clean Energy

Environmental
Drinking Water System Improvements in Quaaout Community

Infrastructure
Highway 69 Twinning

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements

Parks & Recreation
Pexsisen Elementary School

Environmental
Calgary Zoo Flood Mitigation

Infrastructure
Gitwinksihlkw Water Treatment Plant

Environmental
Climate Change Risk Assessment

Building Structures
Broadview Drive Commercial Development

Environmental
37 Street SW Storm Trunk Relocation

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Environmental
Port of Vancouver – Climate Change Adaptation

Structures
SkyTrain Grandview Cut Structural Upgrade

Transportation
Mission Bridge Seismic Retrofit

Water
Jericho Reservoir
LEADERSHIP INSIGHTS
See all insights