Associated Engineering, through our Alternate Delivery Company (Brybil), teamed with the Ledcor-Haisla Limited Partnership to design and construct three bridges on the new heavy haul road at the LNG Canada plant site near Kitimat, BC.
The three bridges were required to be designed to support heavy self-propelled modular transport (SMPT) vehicles, transporting heavy plant-site modules arriving by ships. The weight of the SMPT vehicles was up to 1,348 tonnes with 48 tonne axle loads.

Client
Ledcor Group

Project Highlights
The three structures designed and built included the Anderson Creek Bridge, Moore Creek Bridge, and the Beaver Creek Culvert.
People on this project
More Transportation Projects
See all projects

Bridges
Haisla Bridge Replacement

Bridges
Granville Bridge Seismic Retrofit and Renewal

Transportation
Highway 16 SAFE Corridor

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Pioneer Pedestrian Bridge

Transportation
Moody Street Overpass

Bridges
Muskeg River Bridge

Airports
Vancouver International Airport Parallel Runway

Streetscaping
Nigel Valley Public Spaces

Transportation
Bermuda Runway Rehabilitation

Transportation
Transportation Planning Studies

Transportation
Duggan Bridge Replacement

Transportation
Saline Creek Drive Pedestrian Bridge

Infrastructure
Highway 69 Twinning

Environmental
Highway 40 Emergency Flood Reconstruction
LEADERSHIP INSIGHTS
See all insights